Forest Road Drainage Installation Practices | |
in the Pacific Northwest | ![]() ![]() |
Table of Contents | Use the menu below or the navigation bar above |
PLANNING ISSUES | INSTALLATION PRACTICES | |||
Issues, Objectives, Additional References |
Introduction - 1 | 9 - Compaction |
Base Preparation, Fill Compaction, Fill Depth |
|
Safety, Machine Crossings, Construction Timing |
Site Selection - 2 | 10 - Fisheries Issues |
Fisheries Windows, Fish Passage |
|
Open-Bottom Structures, Metal, Polyethylene, Steel |
Structure Selection - 3 | 11 - Diversion Dams |
Downstream Dams, Upstream Dams |
|
Step-By-Step Assessment, Hazard, Consequence |
Initial Risk Assessment - 4 | 12 - Ditch Management |
Vegetation, Ditch Erosion, Ditch Shape |
|
Alternative Measures, Risk Management |
Revised Risk Assessment - 5 | 13 - Erosion Protection |
Stream Culverts, Cross Drains, Bridges |
|
Step-By-Step Description, Fish Removal |
Diversion Plans - 6 | 14 - Sediment Control |
Planning, Installation, Catch Basins |
|
Deactivation, Water Quality, Piping |
Other Issues - 7 | 15 - Culvert Position |
Channel Alterations, Depth, Slope, Frequency |
|
Legal Requirements, Fish Issues, Environment |
Pre-Work Checklist - 8 | 16 - Shutdown Guidelines |
When To Stop Work Before Leaving The Site |
The information presented in this field guide is based on an InfoFlip publication which was assembled and formatted by ToMo Consulting Services, and Flip Productions Ltd., Nanaimo, BC, Canada. Telephone (250) 722-7282, or toll-free 1-888-220-FLIP (3547). The web version was created by David Beneteau. |
![]() |
©1999 - 2001 Flip Productions Limited |